SmartFix - I-40/James White Parkway/Hall of Fame Drive - Tennessee Department of Transportation: Q: Will this project help the First Creek flooding problems north of the interstate?
A: Yes – First Creek currently flows in a box culvert under I-40. This box culvert will be replaced by longer span bridges, thus lowering the upstream headwater to help control flooding. In addition, the entire creek has been modeled to ensure that downstream problems are not created by allowing more flow through the I-40 crossing.
No comments:
Post a Comment